{"id":12170,"date":"2026-10-25T17:04:57","date_gmt":"2026-10-25T23:04:57","guid":{"rendered":"https:\/\/sbbch.org\/?p=12170"},"modified":"2026-10-25T17:04:57","modified_gmt":"2026-10-25T23:04:57","slug":"public-lands-nps-comments-on-new-bike-rules","status":"publish","type":"post","link":"https:\/\/sbbch.org\/?p=12170","title":{"rendered":"Public Lands &#8211; NPS comments on new bike rules"},"content":{"rendered":"<p><a href=\"https:\/\/sbbch.org\/wp-content\/uploads\/2026\/10\/Screenshot-2026-10-25-165907.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-12171\" src=\"https:\/\/sbbch.org\/wp-content\/uploads\/2026\/10\/Screenshot-2026-10-25-165907.jpg\" alt=\"\" width=\"959\" height=\"363\" srcset=\"https:\/\/sbbch.org\/wp-content\/uploads\/2026\/10\/Screenshot-2026-10-25-165907.jpg 959w, https:\/\/sbbch.org\/wp-content\/uploads\/2026\/10\/Screenshot-2026-10-25-165907-300x114.jpg 300w, https:\/\/sbbch.org\/wp-content\/uploads\/2026\/10\/Screenshot-2026-10-25-165907-768x291.jpg 768w\" sizes=\"auto, (max-width: 959px) 100vw, 959px\" \/><\/a> <a href=\"https:\/\/sbbch.org\/wp-content\/uploads\/2026\/10\/Screenshot-2026-10-25-165924.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-12172\" src=\"https:\/\/sbbch.org\/wp-content\/uploads\/2026\/10\/Screenshot-2026-10-25-165924.jpg\" alt=\"\" width=\"962\" height=\"473\" srcset=\"https:\/\/sbbch.org\/wp-content\/uploads\/2026\/10\/Screenshot-2026-10-25-165924.jpg 962w, https:\/\/sbbch.org\/wp-content\/uploads\/2026\/10\/Screenshot-2026-10-25-165924-300x148.jpg 300w, https:\/\/sbbch.org\/wp-content\/uploads\/2026\/10\/Screenshot-2026-10-25-165924-768x378.jpg 768w\" sizes=\"auto, (max-width: 962px) 100vw, 962px\" \/><\/a><\/p>\n<p class=\"wp-block-paragraph\">Opening an existing trail within a national park to mountain bikes is a complicated process, and perhaps as a result, there are very few parks with bike trails. Under rules the National Park Service adopted in 2012, a park needs a bike-specific planning document, an environmental assessment or impact statement, a written determination, a public comment period, and sign-off from a regional director, even if the trail is already built. Now the NPS wants to drop most of those steps, and the public has until November 2 to weigh in.<\/p>\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/www.federalregister.gov\/d\/2026-17902\">proposed rule<\/a>, published in the Federal Register on September 1, would have parks evaluate bike access the same way they evaluate other recreational uses. IMBA calls it \u201cthe biggest change to its bicycle rules since the current rule was adopted in 2012\u201d and <a href=\"https:\/\/www.imba.com\/press-release\/easing-barriers-bike-access-national-parks\">says it supports the proposal<\/a>, with two important tweaks.<\/p>\n<h2 id=\"h-what-s-being-proposed\" class=\"wp-block-heading\">What\u2019s being proposed<\/h2>\n<p class=\"wp-block-paragraph\">The NPS says the current bike rules \u201cunnecessarily restrict recreation and access\u201d and force parks to spend time and money on reviews that federal environmental law doesn\u2019t require. In one example from the proposal, a park would need to prepare a planning document before allowing bikes on \u201ca 20-foot paved path connecting a parking lot with a visitor center.\u201d<\/p>\n<p class=\"wp-block-paragraph\">Under the proposed rule, bikes and e-bikes would be allowed on park roads and in parking areas open to public vehicle traffic. That\u2019s already true for traditional bikes, but it would be new for e-bikes, which currently need a superintendent\u2019s designation. Some parks, like Zion National Park in Utah, already allow e-bikes on roads within the park.<\/p>\n<p class=\"wp-block-paragraph\">Beyond roads, superintendents could open trails, administrative roads, and other locations to bikes and e-bikes after notifying the public, without the bike-specific planning document, written determination, or mandatory environmental assessment.<\/p>\n<p class=\"wp-block-paragraph\">There are limits, though. A formal public review in the Federal Register would still be required if a designation is \u201chighly controversial or otherwise significant,\u201d or if the location has \u201cnever been improved by artificial or processed materials\u201d like gravel, asphalt, or wood boards, which would apply to most natural-surface trails. Trails built on old rail lines wouldn\u2019t need one, and bikes and e-bikes would remain banned in designated Wilderness.<\/p>\n<p class=\"wp-block-paragraph\">In a press release, an agency representative said, \u201cthis proposal would create a simpler, more consistent approach to bicycle and e-bike access across the national park system.\u201d<\/p>\n<h2 id=\"h-imba-weighs-in-on-the-proposed-rule-change\" class=\"wp-block-heading\">IMBA weighs in on the proposed rule change<\/h2>\n<p class=\"wp-block-paragraph\">IMBA, which worked with the NPS on the 2012 rule, calls the new proposal \u201ca common-sense update.\u201d The group points out that \u201ca short segment of trail managed by the National Park Service can be critically important to a larger trail system,\u201d but that the current process for making those connections has been \u201cslow and costly.\u201d<\/p>\n<p class=\"wp-block-paragraph\">IMBA also stresses that \u201cno trails would open automatically.\u201d Each decision would still be made park by park, and would depend on park staff having the capacity to plan and manage it.<\/p>\n<p class=\"wp-block-paragraph\">However, the group is recommending two changes to the proposal. First, IMBA says opening a trail to traditional bikes shouldn\u2019t automatically open it to e-bikes; superintendents should manage e-bikes by class, and shared recreational trails should be limited to Class 1 e-bikes. Second, IMBA wants the rule to more clearly show how sustainable design will continue to be addressed, since the proposal drops the existing requirement that new trails follow NPS sustainable design principles.<\/p>\n<p class=\"wp-block-paragraph\">IMBA says it isn\u2019t trying to turn national parks into riding destinations. \u201cIMBA does not envision National Park Service units as destination mountain biking locales,\u201d the group wrote, adding that even with the rule change, many park trails will remain managed primarily for hiking.<\/p>\n<p class=\"wp-block-paragraph\">Currently, it\u2019s rare to find mountain bike trails in national parks, though a few do. <a href=\"https:\/\/www.nps.gov\/thingstodo\/ride-the-big-hollow-trail.htm\">Mammoth Cave National Park<\/a> in Kentucky has the 9.1-mile Big Hollow singletrack, and <a href=\"https:\/\/www.nps.gov\/thingstodo\/go-mountain-biking-in-cuyahoga-valley.htm\">Cuyahoga Valley National Park<\/a> in Ohio has four mountain bike trails in its East Rim system. In 2020, <a href=\"https:\/\/www.singletracks.com\/mtb-trails\/proposal-to-build-singletrack-bike-trails-in-smoky-mountains-national-park-comment-now\/\">trails were proposed<\/a> in a portion of Great Smoky Mountains National Park along the Foothills Parkway corridor.<\/p>\n<h2 id=\"h-how-to-comment\" class=\"wp-block-heading\">How to comment<\/h2>\n<p class=\"wp-block-paragraph\">Comments must be received by 11:59 pm ET on Monday, November 2, 2026, and you can use <a href=\"https:\/\/www.regulations.gov\/commenton\/NPS-2026-0166-0001\">this online form<\/a>. Keep in mind that comments may be posted publicly as submitted, including any of your personal information.<\/p>\n<p class=\"wp-block-paragraph\">IMBA also offers <a href=\"https:\/\/www.imba.com\/press-release\/easing-barriers-bike-access-national-parks#anchor\">a comment form on its website<\/a>. The group says \u201cgeneric opposition is often discounted\u201d and that duplicate comments \u201cwill not count individually,\u201d so specific, personal comments carry the most weight. IMBA suggests mentioning whether you also hike, camp, or visit parks for their history, and naming parks where bike access could improve your experience. According to IMBA, a revised rule and Draft Environmental Impact Statement are expected to follow, with a second opportunity for public comment.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Opening an existing trail within a national park to mountain bikes is a complicated process, and perhaps as a result, there are very few parks with bike trails. Under rules the National Park Service adopted in 2012, a park needs a bike-specific planning document, an environmental assessment or impact statement, a written determination, a public [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[17,10,48],"tags":[],"class_list":["post-12170","post","type-post","status-publish","format-standard","hentry","category-around-the-campfire","category-bchi-bcha","category-public-lands"],"_links":{"self":[{"href":"https:\/\/sbbch.org\/index.php?rest_route=\/wp\/v2\/posts\/12170","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sbbch.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sbbch.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sbbch.org\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/sbbch.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12170"}],"version-history":[{"count":1,"href":"https:\/\/sbbch.org\/index.php?rest_route=\/wp\/v2\/posts\/12170\/revisions"}],"predecessor-version":[{"id":12173,"href":"https:\/\/sbbch.org\/index.php?rest_route=\/wp\/v2\/posts\/12170\/revisions\/12173"}],"wp:attachment":[{"href":"https:\/\/sbbch.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12170"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sbbch.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12170"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sbbch.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12170"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}